橫梁吊具使用方法及注意事項(xiàng)

        橫梁吊具使用方法及注意事項(xiàng)

1.移動(dòng)天車,使天車吊鉤與吊梁的吊環(huán)連接,當(dāng)起升到合適高度后,察看吊梁是  否水平,吊鏈?zhǔn)欠翊蚪Y(jié)。

2.然后移動(dòng)主粱,到被吊物上方,用連接索具與被吊物連接,然后緩慢提升天車。

3.試吊平衡天車提升后,主粱平衡度應(yīng)小于1°,用肉眼觀察承載梁是否處于平衡狀態(tài),當(dāng)完全處于平衡狀態(tài)時(shí),即可進(jìn)行吊運(yùn)。

4.負(fù)載試吊負(fù)載試吊過程就是整體準(zhǔn)備的最后過程,操作的全部過程的最后部分,應(yīng)緩慢提升負(fù)載,當(dāng)剛剛離地時(shí),停止提升,觀察整體受力情況,然后緩慢放松負(fù)載,如沒有異常,方可正常吊運(yùn)。

Use method and matters needing attention

1、Mobile crane, crane hook and the hanging beam suspension loop connection, when lifting to a suitable height, see whether hanging beam, knot whether chain hoist.

2、Then move the main beam, to suspended above, use link rigging and suspended substance, then slowly lift crown.

3、Try balance after crown ascension, main beam balance should be less than 1 °, observe whether the bearing beam is in equilibrium with the naked eye, when fully in balance, lifting can be achieved.

4、Load try hanging load lifting process is to prepare to the end of the process, the overall operation of the whole process of the last part, should slowly lift the load, when just off the ground, stop to ascend, observe the overall stress distribution, and then slowly relax load, such as no abnormalities, can normal lifting.

        吊運(yùn)注意事項(xiàng)

1、吊梁使用前首先目視橫梁梁體有無變形、裂紋、焊縫開焊等異?,F(xiàn)象。試吊過程要滿足負(fù)載的運(yùn)行路線,環(huán)境條件,確定起升和放升位置,對(duì)有影響起吊一律不能吊運(yùn),對(duì)于主吊梁配備的索具(T8級(jí)高強(qiáng)合金鏈條),使用時(shí)不能變位、打結(jié)。

2、試吊過程中,梁體負(fù)載有異常響聲、變形、裂紋立即停止試吊。

3、當(dāng)試吊成功后,才能進(jìn)行起吊、吊運(yùn),在吊運(yùn)過程中讓有關(guān)人員必須明白識(shí)別標(biāo)志,讓操作人員看得見的通訊聯(lián)絡(luò)。

4、在吊運(yùn)負(fù)載時(shí),不允許超載使用,梁體必須處于平穩(wěn)狀態(tài),梁體不能產(chǎn)生擺動(dòng),防止梁體失去平衡,釀成安全事故。

5、負(fù)載下邊嚴(yán)禁站人,禁止人工扶載。

Lifting points for attention

1、Hanging beam first before use visual beam girder with or without deformation, crack, seam welding anomalies, such as open. Try lifting process to meet the running route of load, environmental conditions, determine the lifting and put up the position, to have an impact on lifting is not lifting, lift for the main beam is equipped with rigging (T8 high strength alloy chain), not when using displacement, knot.

2、Try lifting process, the beam deformation, crack load have abnormal sound, immediately stop try to mourn.

3、Can only be carried out when test after the success of the crane, lifting, lifting, the lifting make relevant personnel must understand in the process of identification, make visible communications operators.

4、When lifting load, are not allowed to use, overload beam body must be in steady state, the beam body does not produce swing, beam body out of balance, to prevent safety accidents.

5、It is forbidden to stand at the bottom of load, artificial lift load is prohibited.